1. Photo 430/58(23)
- Reference (shelfmark):
- Photo 430/58(23)
- Title:
- Well No 7, [Curzon Bridge construction, Allahabad]. Photographer: Unknown
- Scope & Content:
- Genre: Historical Events View of the well weighed down with old rails and pig-iron. Three European engineers are standing on top. Gales writes (see notes in Introduction): 'By the 24th April well No 7 had been sunk to a depth of 98 feet below low-water level, and was 2 feet in the clay...As nei...
- Collection Area:
- Visual Arts
- Languages:
- Not applicable
- Date Range:
- Unspecified
- Extent:
- 1 item